01
STEP 01
Pre-Construction Planning & Scheduling
Roofing projects are planned around Vancouver weather,
building requirements and resident schedules. Larger
strata properties may use phased construction to reduce
disruption and maintain safer access.
Weather planning
Phased work
Resident notices
02
STEP 02
Safety Planning & Site Setup
Before work begins, the site is organized to protect
workers, residents and visitors. Fall protection,
controlled access and designated material storage help
create a safer construction environment.
Fall protection
Site barriers
Access control
03
STEP 03
Tear-Off or Overlay Preparation
Depending on the existing roof assembly, preparation may
involve complete removal or an approved overlay approach.
A tear-off can also expose the roof deck for inspection
and necessary repairs.
Roof removal
Deck inspection
Waste control
04
STEP 04
Deck Repairs & Drainage Corrections
Once the existing roof is opened, underlying issues can be
addressed before the new system is installed. Depending
on site conditions, this may include deck replacement,
reinforcement, slope corrections or drain modifications.
Deck repairs
Drainage
Structural review
05
STEP 05
Installation of the New Roofing System
The selected roofing system is installed according to
manufacturer requirements and project specifications.
Quality-control checks at key stages help verify proper
workmanship and installation details.
System installation
Quality checks
Warranty review
06
STEP 06
Flashing, Penetrations & Edge Details
Parapets, HVAC curbs, vents, skylights and other
penetrations receive carefully integrated details.
Proper flashing and edge termination help protect
vulnerable roof transitions.
Parapet flashing
HVAC details
Edge metal
07
STEP 07
Final Inspection & Documentation
Finally, the completed roof is reviewed before project
closeout. Warranty registration, inspection records and
as-built information can be organized for the strata's
long-term records.
Final inspection
Warranty records
Handover
01
STEP 01
Pre-Construction Planning & Scheduling
Roofing projects are planned around Vancouver weather,
building requirements and resident schedules. Larger
strata properties may use phased construction to reduce
disruption and maintain safer access.
Weather planning
Phased work
Resident notices
02
STEP 02
Safety Planning & Site Setup
Before work begins, the site is organized to protect
workers, residents and visitors. Fall protection,
controlled access and designated material storage help
create a safer construction environment.
Fall protection
Site barriers
Access control
03
STEP 03
Tear-Off or Overlay Preparation
Depending on the existing roof assembly, preparation may
involve complete removal or an approved overlay approach.
A tear-off can also expose the roof deck for inspection
and necessary repairs.
Roof removal
Deck inspection
Waste control
04
STEP 04
Deck Repairs & Drainage Corrections
Once the existing roof is opened, underlying issues can be
addressed before the new system is installed. Depending
on site conditions, this may include deck replacement,
reinforcement, slope corrections or drain modifications.
Deck repairs
Drainage
Structural review
05
STEP 05
Installation of the New Roofing System
The selected roofing system is installed according to
manufacturer requirements and project specifications.
Quality-control checks at key stages help verify proper
workmanship and installation details.
System installation
Quality checks
Warranty review
06
STEP 06
Flashing, Penetrations & Edge Details
Parapets, HVAC curbs, vents, skylights and other
penetrations receive carefully integrated details.
Proper flashing and edge termination help protect
vulnerable roof transitions.
Parapet flashing
HVAC details
Edge metal
07
STEP 07
Final Inspection & Documentation
Finally, the completed roof is reviewed before project
closeout. Warranty registration, inspection records and
as-built information can be organized for the strata's
long-term records.
Final inspection
Warranty records
Handover